Used 2023 BMW M3 Competition

Stock: PN12582VIN: WBS43AY05PFN89811

Stock: PN12582 VIN: WBS43AY05PFN89811

Used 2023 BMW M3 Competition

Vehicle Highlights

Located at Nissan of Fort Myers

Overview
PN12582
Stock
WBS43AY05PFN89811
VIN
19,069
Miles
Sedan
Body
AWD
Drivetrain
Skyscraper Gray Metallic
Exterior
Black
Interior
112.5
Wheelbase
3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp
Engine
Gas
Fuel
8-Speed Automatic Steptronic
Transmission
4
Doors
22*
Highway MPG (EPA estimate)
16*
City MPG (EPA estimate)
Description
Recent Arrival! Clean CARFAX. Skyscraper Gray Metallic 2023 BMW M3 Competition
Details
Model Overview
The BMW 3-series hits the road with the rear-wheel-drive 330i and M340i, plus their all-wheel-drive counterparts, the 330i xDrive and M340i xDrive. The M340i and M340i xDrive also benefit from M Performance chassis tuning and an M Sport rear differential, which only heightens their capabilities.

Power in the 330i models comes from a revised twin-turbocharged 2.0L inline-four that makes 255 hp at 5,000 rpm and 295 lb-ft of torque from as low down in the rev range as 1,550 rpm. This is an extra 7 horses and 37 lb-ft over its predecessor thanks to some fine-tuning of BMW's TwinPower system--the turbos, the direct injection fuel system and the nifty camshaft and valve timing systems Double-VANOS and VALVETRONIC. BMW claims 5.6 seconds in the sprint from 0 to 60 mph with the 2-wheel-drive variant, while the xDrive shaves three-tenths from that figure. The M340i models, meanwhile, come with a twin-turbocharged 3.0L inline-six that produces 382 hp and 369 lb-ft of torque. According to BMW, it will hit 60 mph in just 4.2 seconds. Both engines are mated exclusively to an 8-speed automatic transmission with paddle shifters and manual mode; no manual transmission available.

The new RWD M3 is powered by a 3L twin turbo 6-cylinder that produces 473 horsepower with the 6-speed manual transmission and 503 horsepower with the 8-speed automatic. The 330 e hybrid draws its power from a 2L turbocharged 4-cylinder mated to an electric motor that delivers 288 horsepower and increases the range to 290 miles.

The 3-series is offered in Sport Line, Luxury, and M Sport trims, which differ largely through subtle exterior design differences. Standard features include 18-inch wheels (19 for M Sports), auto start-stop, dynamic stability control, 14-way power front seats with SensaTec upholstery, fine-wood inlays, a 10-speaker premium sound system, iDrive with an 8.8-inch central screen, dynamic cruise control, a rearview camera, a multifunction steering wheel with Bluetooth hands-free connectivity with audio streaming, plus an automatic three-zone climate control system, ambient lighting and rain-sensing windshield wipers.

Options include remote start, heated seats and steering wheel, wireless charging and WiFi hotspot, a Harman/Kardon surround sound system, and active cruise control. A convenience package brings blind-spot detection and lane departure warning, LED headlights with cornering lights. The premium package includes a head-up display with BMW navigation and more, plus heated seats and steering wheel. A track handling package adds enhanced steering, suspension and tires, plus an M Sport differential to improve control and large M Sport brakes.
Model Strengths
A Variety Of Options
Athletic Driving Feel
Fuel Efficiency
High-tech Options
Long List Of Appearance Packages And Trims
Compact Size And Maneuverability
Practicality And Comfort
Model Changes
The BMW 3-series get a refreshed exterior and a larger touchscreen for 2023 while the M3 carries over with minimal changes.
Model Value
The BMW 3-series is now in its seventh generation, though the high performance M3 carries over from the sixth generation. The entire range still stands out for being athletic, responsive and fun to drive, as well as relatively fuel-efficient. The 3-series represents the quintessential sports sedan, with far better handling and peppier performance than the equivalent front-wheel drive mid-sized car. Sticking with tradition, the BMW 3-series continues to be rear-wheel drive based, which does wonders for the car's weight distribution and handling, allowing the car to drive like a far more athletic vehicle despite its somewhat humble (but still stylish) 4-door shape.
Features
Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8)
M Sport Seats
M Carbon Bucket Seats
Extended Merino Leather Upholstery
Radio: AM/FM Audio System
M Compound Brakes w/Red Calipers
M Shadowline Lights
Carbon Fiber Trim
Icon Adaptive LED Headlights w/Laserlight
M Carbon Exterior Package
Power Front Seats
Lumbar Support
Heated Front Seats
SiriusXM Satellite Radio w/1 Year Subscription
harman/kardon Surround Sound System
BMW Assist eCall
BMW TeleServices
ConnectedDrive Services
Connected Package Pro
Enhanced USB & Bluetooth Plus Smartphone Integration
BMW Curved Display
Apple CarPlay & Android Auto Compatibility
4-Wheel Disc Brakes
Emergency communication system: BMW Assist eCall
harman/kardon Speakers
Auto High-beam Headlights
Exterior Parking Camera Rear
AM/FM radio: SiriusXM
Compass
16 Speakers
Speed-Sensitive Wipers
Auto-dimming Rear-View mirror
Front beverage holders
Variably intermittent wipers
Turn signal indicator mirrors
Trip computer
Traction control
Tilt steering wheel
Telescoping steering wheel
Steering wheel mounted audio controls
Sport steering wheel
Split folding rear seat
Speed-sensing steering
Speed control
Security system
Remote keyless entry
Rear window defroster
Rear reading lights
Rear anti-roll bar
Rear air conditioning
Rain sensing wipers
Radio data system
Power windows
Power steering
Power passenger seat
Power driver seat
Power door mirrors
Passenger vanity mirror
Passenger door bin
Panic alarm
Overhead airbag
Outside temperature display
Occupant sensing airbag
Memory seat
Low tire pressure warning
Knee airbag
Illuminated entry
Heated front seats
Heated door mirrors
Garage door transmitter
Fully automatic headlights
Front reading lights
Front dual zone A/C
Front anti-roll bar
Four wheel independent suspension
Dual front side impact airbags
Dual front impact airbags
Driver vanity mirror
Driver door bin
Delay-off headlights
Bumpers: body-color
Brake assist
Automatic temperature control
Auto-dimming door mirrors
Alloy wheels
Adaptive suspension
ABS brakes
Tachometer
Spoiler
Navigation System
Leather Shift Knob
Front Center Armrest
Front Bucket Seats
Electronic Stability Control
Air Conditioning
Package
Connected Package Pro
Mechanical
Engine: 3.0L 6-Cylinder TwinPower Turbo
Engine Auto Stop-Start Feature
Electronic Transfer Case
Part And Full-Time All-Wheel
3.15 Axle Ratio
Engine Oil Cooler
70-Amp/Hr Maintenance-Free Battery w/Run Down Protection
Regenerative Alternator
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.6 Gal. Fuel Tank
Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Strut Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Exterior
Tires: 275/35R19 Fr & 285/30R20 Rr Performance -inc: Non run-flat
Tire Mobility Kit
Paint w/Badging
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Rocker Panel Extensions
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Black Power Heated Auto Dimming Side Mirrors w/Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Galvanized Steel/Aluminum/Composite Panels
Lip Spoiler
Black Grille
Trunk Rear Cargo Access
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
16 Speakers
Streaming Audio
Window Grid Diversity Antenna
harman/kardon Surround Sound System
2 LCD Monitors In The Front
Artti Real-Time Traffic Display
Interior
12-Way Driver Seat -inc: Manual Cushion Extension
12-Way Passenger Seat -inc: Manual Cushion Extension
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Manual Tilt/Telescoping Steering Column
Front Cupholder
Rear Cupholder
Compass
Interior Lock Disable
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
HVAC -inc: Underseat Ducts, Residual Heat Recirculation and Console Ducts
Illuminated Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert, Metal-Look Door Panel Insert, Aluminum Console Insert and Metal-Look Interior Accents
Full Cloth Headliner
Leatherette Door Trim Insert
Leather/Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Full Floor Console w/Covered Storage and 3 12V DC Power Outlets
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Cargo Area Concealed Storage
Cargo Net
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Memory Settings -inc: Driver Seat and Door Mirrors
Integrated Navigation System w/Voice Activation
Tracker System
ConnectedDrive Services
Apple CarPlay & Android Auto Compatibility
Instrument Panel Covered Bin, Driver / Passenger And Rear Door Bins
Delayed Accessory Power
Driver Information Center
Redundant Digital Speedometer
Outside Temp Gauge
BMW TeleServices
BMW Curved Display
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
Sliding Front Center Armrest
Perimeter Alarm
Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Blind Spot Detection Blind Spot
Frontal Collision Warning
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Driver And Passenger Knee Airbag
Rear Child Safety Locks
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Pretensioners
Similar Vehicles

2023 BMW M3 Competition

Stock: FGPR25734

Quick View

2021 BMW 5 Series 530i

Stock: C14698A

Quick View

2020 BMW 5 Series 530i

Stock: FG071318A

Quick View

2025 BMW 2 Series 228 xDrive

Stock: FGPS58407

Quick View

Dealer FAQs

Can I get financed for an auto loan at Nissan of Fort Myers?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Nissan of Fort Myers to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call (239) 415-8600 or apply online now.

What is the financing process like at Nissan of Fort Myers?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at Nissan of Fort Myers?

Great question. Securing a competitive loan from Nissan of Fort Myers takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call (239) 415-8600. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Fort Myers.

What is involved in securing an auto loan in Fort Myers FL?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Fort Myers come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Nissan of Fort Myers to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial (239) 415-8600 when you have a few free moments and you'll soon see that getting approved for a car loan at Nissan of Fort Myers is quick, easy, and convenient.

Dealership advertised price is plus tax, tag, title, pre-delivery service fee of $1,299, Private Tag Agency Fee of $298, and Electronic Registration Filing Fee of $599.95. These charges represent costs and profits to the dealer for cleaning, inspecting, reconditioning vehicles, and preparing documents related to the sale.
New vehicle pricing is plus optional dealer-installed options.
Pre-owned vehicle pricing is plus the Nissan of Fort Myers optional Platinum Premier Package of $2,399.98, and optional Certification Fees (if applicable).
All advertised pricing is on in-stock units only and is subject to change without notice. Advertised pricing includes all manufacturers’ discounts and rebates.
All offers are contingent on financing through NMAC, the manufacturer’s captive lender. While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions. Please verify any information in question with the dealer. Fort Myers Bonus Cash Offer is a conditional trade-in incentive available with the purchase of a new 2026 in-stock vehicle. Actual trade-in value will be based on dealership appraisal and adjusted for vehicle condition, mileage, and market demand. Not all vehicles will qualify for the maximum trade-in bonus. Trade-in bonus is applied toward the purchase price and cannot be redeemed for cash. Negative equity may affect trade-in payoff and final pricing. Cannot be combined with other trade-in offers.
Loyalty Discount applies to customers who have purchased three (3) or more vehicles from Nissan of Fort Myers within the last seven (7) years.
See dealer for complete details.
© 2026 Nissan of Fort Myers

OUR BRAND-NEW SHOWROOM IS OPEN - VISIT US TODAY!