Used 2023 BMW M3 Competition
Stock: FGPR25734VIN: WBS33AY02PFR25734
Stock: FGPR25734 VIN: WBS33AY02PFR25734
Used 2023 BMW M3 Competition
$87,975
Vehicle Highlights
Located at Genesis of Fort Myers
- FGPR25734
- Stock
- WBS33AY02PFR25734
- VIN
- 17,019
- Miles
- Sedan
- Body
- RWD
- Drivetrain
- Black Sapphire Metallic
- Exterior
- Kyalami Orange/Black
- Interior
- 6 Cyl, 3.0L
- Engine
- Gas
- Fuel
- 8-speed automatic
- Transmission
- 4
- Doors
- 23*
- Highway MPG (EPA estimate)
- 16*
- City MPG (EPA estimate)
Welcome to Fort Myers Genesis. Fort Myers Genesis is committed to 100% customer satisfaction, no exceptions.
Vehicle Details
Experience performance and refinement with this 2023 BMW M3 Competition, a standout example of BMW engineering located in Fort Myers, FL. With only 17,019 miles, this low-mileage BMW M3 Competition delivers thrilling power from its inline 6-cylinder, 3.0L gasoline engine and a driver-focused rear-wheel-drive layout that enhances handling responsiveness and balanced dynamics.
This BMW M3 Competition pairs exhilarating performance with upscale amenities and advanced technology. Key features include Cross-Traffic Alert for safer lane changes and backing maneuvers, Remote Start for climate comfort on demand, and Parking Assistance to simplify tight-space maneuvering. Stay connected on every drive with Apple CarPlay integration, while the Heated Steering Wheel adds comfort during cooler mornings and elevates the cabin experience.
The BMW M3 Competition's athletic stance and precision-tuned suspension communicate its motorsport pedigree, while a refined interior offers supportive seating and intuitive controls designed for both spirited driving and daily use. Premium materials and thoughtful ergonomics make each journey enjoyable, whether navigating city streets or carving through coastal roads near Fort Myers.
Carefully inspected and maintained, this example represents a compelling option for enthusiasts seeking a near-new performance sedan with low mileage and a strong equipment list. Schedule a test drive in Fort Myers to experience the dynamic character and high-level features of this 2023 BMW M3 Competition firsthand.
Equipment
This model offers Android Auto for seamless smartphone integration. This model offers Apple CarPlay for seamless connectivity. See what's behind you with the back up camera on this small car. The BMW M3 is painted with a sleek and sophisticated black color. It has a clean CARFAX vehicle history report. Maintaining a stable interior temperature in this model is easy with the climate control system. It employs advanced tech for collision avoidance, enhancing safety on the road. This vehicle's Cross-Traffic Alert: Safeguarding you from unexpected traffic when reversing. This unit features cruise control for long trips. It has a 6 Cyl, 3.0L high output engine. Enjoy the tried and true gasoline engine in this vehicle. This vehicle features a hands-free Bluetooth phone system. Keep your hands warm all winter with a heated steering wheel in the BMW M3 . The leather seats in this model are a must for buyers looking for comfort, durability, and style. With the adjustable lumbar support in the vehicle your back will love you. You'll never again be lost in a crowded city or a country region with the navigation system on this unit. This 2023 BMW M3 's Parking Assistance makes parkign effortless with automated guidance and precision. Enjoy the incredible handling with the rear wheel drive on this small car. Never get into a cold vehicle again with the remote start feature on this 2023 BMW M3 . Small and nimble this unit scoots through traffic. It offers great fuel mileage and ease of parking.
Packages
Parking Assistance Package: Parking Assistant Plus Driving Assistance Professional Package: Extended Traffic Jam Assistant; Active Driving Assistant Pro Executive Package: Remote Engine Start; BMW Curved Display with HUD; Heated Steering Wheel; Power Tailgate; SensaTec Dashboard Carbon Fiber Trim Black Sapphire Metallic Front Ventilated Seats **Equipment listed is based on original vehicle build and subject to change. Please confirm the accuracy of the included equipment by calling the dealer prior to purchase.**
Additional Information
Call today to schedule a vehicle showing with an experienced Fort Myers Genesis consultant. If you have a quick question about this unit, don't hesitate to call. Now that you found a vehicle you like, let's schedule a time for you to take a pressure free test drive.
Apple CarPlay
Blind Spot Monitor
Bluetooth®
Brake Assist
Collision Warning
Ventilated Seats
Cruise Control
Heated Seats
Lane Keep
Leather Seats
Multi-zone Climate
Navigation
Parking Assist
Power Seat
Push Button Starting
Rearview Camera
Sunroof / Moonroof
Sunshade
Remote Start
Heated Steering Wheel
Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Nissan of Fort Myers to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call (239) 415-8600 or apply online now. Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted. Great question. Securing a competitive loan from Nissan of Fort Myers takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call (239) 415-8600. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision. After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Fort Myers. The answer to this question includes a variety of factors, such as: People from all around Fort Myers come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs. Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously. Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial (239) 415-8600 when you have a few free moments and you'll soon see that getting approved for a car loan at Nissan of Fort Myers is quick, easy, and convenient.
New vehicle pricing is plus optional dealer-installed options.
Pre-owned vehicle pricing is plus the Nissan of Fort Myers optional Platinum Premier Package of $2,399.98, and optional Certification Fees (if applicable).
All advertised pricing is on in-stock units only and is subject to change without notice. Advertised pricing includes all manufacturers’ discounts and rebates.
All offers are contingent on financing through NMAC, the manufacturer’s captive lender. While every reasonable effort is made to ensure the accuracy of this information, we are not responsible for any errors or omissions. Please verify any information in question with the dealer. Fort Myers Bonus Cash Offer is a conditional trade-in incentive available with the purchase of a new 2026 in-stock vehicle. Actual trade-in value will be based on dealership appraisal and adjusted for vehicle condition, mileage, and market demand. Not all vehicles will qualify for the maximum trade-in bonus. Trade-in bonus is applied toward the purchase price and cannot be redeemed for cash. Negative equity may affect trade-in payoff and final pricing. Cannot be combined with other trade-in offers.
Loyalty Discount applies to customers who have purchased three (3) or more vehicles from Nissan of Fort Myers within the last seven (7) years.
See dealer for complete details.